AL AJBAN BOOTCAMP

 

One of our clients entrusted us again together with our partner #Abdin Industrial Est to do their project at Al Ajban, Abu Dhabi.

We supplied and installed full kitchen equipment for their social club kitchen project.


Full kitchen composed of 6 different areas:

1. Cold Store
• Stainless Steel Vertical Fridge and Freezers

2. Dry storage
• Heavy duty racking systems

3. Washing Area

• Dishwashing Machine
• Wall-type exhaust condensation hood
• Sorting table with double sink unit
• Waste bins

4. Preparation Area
• Hand wash basin, knee operated
• Working tables
• Double bowl sink unit
• Wall shelves

5. Cooking Area
• SS 1-door vertical freezer
• SS 2-door vertical refrigerator
• Tray trolley
• Tilting Pan
• Boiling pan, gas operated
• Neutral unit
• 6-burner cooking range, gas operated
• 2-well deep fryer, gas operated
• Electric chip-dump
• Charcoal grill, gas operated
• Fry top with steel flat plate, gas operated
• Island-type exhaust hood
• Solid shelving unit
• Hand wash basin, knee operated

6. Self-Service Line Area
• Self service line, full unit
• Tray trolley
• Hand wash basin, knee operated
• Neutral unit
• Cold drink dispenser
• Water boiler
• Wall mounted glue board insect trap